Fourteenth Spawn: Difference between revisions

From Novylen Minecraft
Jump to navigation Jump to search
Content deleted Content added
Ellerian (talk | contribs)
m fixed typo
Dakto (talk | contribs)
Added Diamond Town and added wiki page references for each town mentioned
Line 15: Line 15:


Locations that started being built during this time include:
Locations that started being built during this time include:
*Ordawnia
*[[Ordawnia]]
**Started by TodoNihilo. Construction started in October, 2024.
**Started by TodoNihilo. Construction started in October, 2024.
*[[Diamond Town]]
*Mountainside
**Started by Dakto_. Construction started in March, 2024.
*[[Mountainside]]
**Started by Lmaxplay. Construction started in 2022.
**Started by Lmaxplay. Construction started in 2022.

Revision as of 13:25, 1 March 2026

Fourteenth Spawn
Spawn Info
Date: January 20th, 2022
Stargate: 15spawn
Coordinates: -19149, -12, -16907
Landmarks
Landmarks: Topside, Rainbow Valley Shopping Centre, Diamond Town, Diamond Casino and Resort, Copper Village
Notes
Fourteenth Spawn

Novylen's fourteenth spawn, commonly abbreviated as 14spawn, opened to the playerbase on January 20th, 2022. Notable landmarks include Topside, the Rainbow Valley Shopping Centre, Diamond Town started by Dakto_, Diamond Casino and Resort built by Scouter310, and Copper Village started by Breakstuffz.

Notable Locations

Locations that started being built during this time include:

  • Ordawnia
    • Started by TodoNihilo. Construction started in October, 2024.
  • Diamond Town
    • Started by Dakto_. Construction started in March, 2024.
  • Mountainside
    • Started by Lmaxplay. Construction started in 2022.